← Back to SRAUInstallers & Manufacturers / Distributors

SRAU Service Intake Checklist

PHONO Solar Repowering & Asset Upgrade

Share your requirements so our team can prepare a tailored proposal. Items marked * are required. If information is not yet confirmed, enter TBD and the expected confirmation date.

01 Basic Information

Primary enquiry contact.

Include the international dialling code.

Our team will reply to this email address.

Product Categories Required

Select the product categories required. Unmarked workbook items are optional.

Please list different equipment separately. e.g. IEC, UL, CE, GB and applicable standards

02 Delivery & Logistics

CIF / FOB / EXW / DDP / Other

Use YYYY-MM-DD, or enter TBD with the estimated confirmation date.

Other Services Required

Installation & Debugging / Maintenance / Other

03 Project Information (if applicable)
Applicable project details

Latitude and longitude coordinates can be provided

PV Application Type *

Select all that apply.

Use YYYY-MM-DD, or enter TBD with the estimated confirmation date.

Use YYYY-MM-DD, or enter TBD with the estimated confirmation date.

Use YYYY-MM-DD, or enter TBD with the estimated confirmation date.

Initial SRAU(Solar Repowering& Asset Upgrade)Demand *

Select all that apply.

04 PV Equipment Information (if applicable)
Applicable equipment details

Marked fields are required when this section applies. Enter TBD and the expected confirmation date if details are not yet available.

Photo of the label or datasheet

If required, please specify the scope of requirements. e.g. Length<2.5m

Photo of the label or datasheet both acceptable

Internal views, the model designation of the monitoring and control unit, and external views

Either nameplate photographs or instruction manuals (whichever is available)

Photo of the label or datasheet

The name and version number of the software

Please provide detailed installation photos.

Yes / No

Module and inverter labels, combiner box views, substation manuals and installation photos. Share document links or send by email.

05 Energy Storage Requirements

If ‘YES’, please proceed with completing the form below.

ESS Information

Describe the required energy storage equipment and use case. This item is optional in the source workbook.

06 Confirmation

Optional digital equivalent of the workbook signature line.

Use YYYY-MM-DD.

Notes from the checklist
  1. Items marked with (*) are mandatory; unmarked items are optional.
  2. Share relevant documents (RFP, layout drawings, single-line diagrams and other supporting files) by link or email.
  3. If information is not yet confirmed, enter TBD and the estimated confirmation date.
  4. The information is used for project design and quotation. Please complete it as accurately as possible.
  5. Additional services will be quoted separately based on actual requirements.

Supporting documents must be shared by link or email.