← Back to SRAU ASSET OWNERS / INVESTORS

SRAU Project Intake Checklist

PHONO Solar Repowering & Asset Upgrade

Share your project information so our team can assess your existing assets and prepare a tailored repowering and upgrade proposal. Items marked are required. Optional technical information can be provided later.

01 Project Basic Information

Latitude and longitude coordinates can be provided

Primary project contact.

Include the international dialling code.

Our team will reply to this email address.

PV Application Type *

Select all that apply. Describe other applications below.

Complete if you selected Other Special-Application PV.

Initial SRAU(Solar Repowering& Asset Upgrade)Demand *

Select all that apply. Add details about any additional needs below.

02 Asset Assessment & Diagnosis

A complete set of as-built drawings is helpful for the assessment. Add a document link below or send it by email.

Date of the original commercial operation.

For example, number of years remaining.

Target ROI and/or payback period.

Please include the currency and relevant period or unit. This is project information, not a published product price.

Please include the currency and relevant period or unit. This is project information, not a published product price.

Please include the currency and relevant period or unit. This is project information, not a published product price.

Share document links, or indicate that documents will be sent separately by email.

03 PV Equipment Information

The marked fields are required when this section applies. If a specification is not yet known, enter Unknown and provide it later.

Applicable PV equipment details

Provide the module type. A label or datasheet link can be included below.

Describe at least the known requirements; enter Unknown for details to be confirmed. Optional parameter fields below allow more detail (for example, length < 2.5 m).

Photo of the label or datasheet both acceptable

Internal views, the model designation of the monitoring and control unit, and external views

Either nameplate photographs or instruction manuals (whichever is available)

Photo of the label or datasheet

The name and version number of the software

Please provide detailed installation photos.

Yes / No

Module and inverter labels, combiner box internal/external views, substation manuals, monitoring units and installation photos may be linked here or emailed separately.

04 Delivery & Logistics

CIF / FOB / EXW / DDP / Other

Complete if you selected Other.

Other Services Required

Installation & Debugging / Maintenance / Other

05 Other Information

Share an RFP document link or state Not available / Will send by email. Native form submission does not attach files.

Please list different equipment separately.\ne.g. IEC, UL, CE, GB and applicable standards

06 Energy Storage Requirements

If ‘YES’, please proceed with completing the form below.

ESS System Information

Complete the fields below if energy storage equipment is required.

Off-grid / On-grid / On-grid + Off-grid with loading

System Application *

Power Plant / Transmission / Distribution / Utility / C&I / Micro-grid / Fast Charging Station

PV+BESS+DG / PV+BESS / Wind+BESS / Other; DC Coupling or AC Coupling

Anticipated Uses *

Back-up Power / Energy Shifting / Peak Shaving / Frequency Regulation / Voltage Regulation / Black Start / Load Leveling / Capacity Market / EV Charger / Other

ms; Please confirm if there are synchronous devices at site

Please describe the scope of supply required

Your enquiry is submitted through the store contact form. Supporting files must be shared by link or email.